Description: ASI has conducted numerous UST closure and installation projects nation-wide. The projects typically
involve closure of older steel USTs which are replaced with new double wall fiberglass Owens Corning
tanks. Each new system installed is fitted with an EBW electronic monitoring system which is wired
directly into MCI’s nationwide alarm network.
MCI projects represent some of the most
environmentally safe designs for UST systems being installed in the market today. All equipment
utilized by MCI is state-of-the-art, and all work is directly supervised by an on-site MCI Field Engineer. |