Description: The opportunity to participate in this project
came through client referral. ASI was
awarded the contract based on technical
merit and past experience in constructing
aviation fuel systems.
The scope of work
for this design/build project included
installation of 2-30,300-gallon 100 LL
UST, Jet and Avgas Fueling skids, all
underground piping, electrical (power
and communications), and EBW
electronic leak detection system.
Production of CAD drawings and
securing all required fueling systems
permits was included in the scope of
work. The Jet Fuel Skid unloads
transports and loads refuelers at 300
USGPM, while the Avgas Skid unloads
and loads at 200 USGPM. All
underground piping is double wall
fiberglass (4” primary for Jet, 3” primary
for Avgas). The leak detection system
monitors tank interstitial, piping
interstitial, and piping sumps.
This full
service FBO also owns/operates similar
facilities in New Mexico and Colorado.
Project required a high degree of
coordination with the design firm,
general contractor, and Owner and was completed on time and under budget. |